Investigating the Influence of Dam-Breach Parameters on Dam-Break Connected Flood Hydrograph
View through CrossRef
The dam-break connected flood hydrograph properties primarily depend on the breach geometry and the time for the breach to fully develop. Therefore, the prediction of dam’s breach geometry is essential in dam-break studies. To understand the impact of breach parameters on flood peak hydrograph, five of the most common breach prediction methods are implemented in the presented study to estimate the flood hydrographs using 2-dimensional HEC-RAS model. The Ürkmez Dam is chosen as the case study due to the presence of a residential settlement located right at the dam downstream where undesirably any breach of the dam body can have inevitable and dramatical risks on downstream populations and properties. Various levels for reservoir storage are investigated in each method. In order to assess the impact of each breach parameter on the resulting flood hydrographs, sensitivity analysis is carried out. The peak discharge rates and the times to peak for each analyzed scenario are investigated and discussed. Results reveal that Froehlich approach is the most reasonable method for estimating dam-breach parameters as far as exemplified in the Ürkmez Dam case. Furthermore, sensitivity analysis points out that the parameter of the breach side slope has no major influence on the time to peak while having an insignificant impact on the peak discharge. Besides, the study exhibits that both the peak discharge and the time to peak characteristics are highly sensitive to breach time formation parameter. In the light of these targeted findings, the study is aimed to contribute to other relevant research in designating the set of key parameters in experimental or modeling efforts in a way to limit the uncertainty that substantially originates from personal judgment.
Title: Investigating the Influence of Dam-Breach Parameters on Dam-Break Connected Flood Hydrograph
Description:
The dam-break connected flood hydrograph properties primarily depend on the breach geometry and the time for the breach to fully develop.
Therefore, the prediction of dam’s breach geometry is essential in dam-break studies.
To understand the impact of breach parameters on flood peak hydrograph, five of the most common breach prediction methods are implemented in the presented study to estimate the flood hydrographs using 2-dimensional HEC-RAS model.
The Ürkmez Dam is chosen as the case study due to the presence of a residential settlement located right at the dam downstream where undesirably any breach of the dam body can have inevitable and dramatical risks on downstream populations and properties.
Various levels for reservoir storage are investigated in each method.
In order to assess the impact of each breach parameter on the resulting flood hydrographs, sensitivity analysis is carried out.
The peak discharge rates and the times to peak for each analyzed scenario are investigated and discussed.
Results reveal that Froehlich approach is the most reasonable method for estimating dam-breach parameters as far as exemplified in the Ürkmez Dam case.
Furthermore, sensitivity analysis points out that the parameter of the breach side slope has no major influence on the time to peak while having an insignificant impact on the peak discharge.
Besides, the study exhibits that both the peak discharge and the time to peak characteristics are highly sensitive to breach time formation parameter.
In the light of these targeted findings, the study is aimed to contribute to other relevant research in designating the set of key parameters in experimental or modeling efforts in a way to limit the uncertainty that substantially originates from personal judgment.
Related Results
Flood Hydrograph Coincidence Analysis of the Upper Yangtze River and Dongting Lake, China
Flood Hydrograph Coincidence Analysis of the Upper Yangtze River and Dongting Lake, China
Abstract
In hydrological research, flood events can be analyzed by flood hydrograph coincidence. Existing flood hydrograph coincidence research mostly focuses on the analys...
Probabilistic Flood Hazard Maps at Ungauged Locations Using Multivariate Extreme Values Approach
Probabilistic Flood Hazard Maps at Ungauged Locations Using Multivariate Extreme Values Approach
<p>Flood hazard maps are essential for development and assessment of flood risk management strategies. Conventionally, flood hazard assessment is based on determinist...
Dam Break Analysis using HEC-RAS: A Case Study of Karjan Dam
Dam Break Analysis using HEC-RAS: A Case Study of Karjan Dam
A dam is a structure constructed across river which stores water and supplies water for various purposes. Though the dams have many benefits, there is always a threat of dam break ...
Selection of hyetograph shapes for generating synthetic hydrographs in a bivariate analysis for hydrological dam safety assessment.
Selection of hyetograph shapes for generating synthetic hydrographs in a bivariate analysis for hydrological dam safety assessment.
In flood events, in order to evaluate the hydrological dam safety, it should be assessed the frequency curve of maximum reservoir water levels. For this purpose, a large set of inf...
Application of AHP in flood combination calculation of check dam system
Application of AHP in flood combination calculation of check dam system
Check dam is an important water and soil conservation measure for comprehensive treatment of small watershed in the Loess Plateau. The reinforcement of sick and dangerous check dam...
Two-Dimensional Dam Break Modelling of Beris Dam using HEC-RAS
Two-Dimensional Dam Break Modelling of Beris Dam using HEC-RAS
Dam is built for various functions such as water supply, flood and sediment control, electricity generation and irrigation. Floods due to dam breaches create higher peak flows than...
ASP Flood After a Polymer Flood vs. ASP Flood After a Water Flood
ASP Flood After a Polymer Flood vs. ASP Flood After a Water Flood
Abstract
Alkaline-surfactant-polymer (ASP) flooding is an effective technique to improve oil recovery. It has been applied typically after a water flood. Recently, t...
Development of Probabilistic Dam Breach Model Using Bayesian Inference
Development of Probabilistic Dam Breach Model Using Bayesian Inference
Abstract
Dam breach models are commonly used to predict outflow hydrographs of potentially failing dams and are key ingredients for evaluating flood risk. In this...