Javascript must be enabled to continue!
Repair programs development taking into account the presence of high-risk defects on bridges
View through CrossRef
Introduction. In recent years in Ukraine, the weight and traffic volume of vehicles on the roads have increased significantly. Most of the bridges that are operating on these roads were built according to norms, the design loadings of which are not corresponding to the modern loadings on transport facilities.Problem Statement. The issue of bridges operation with defects of the structure in the condition of limited funding of the road industry become particularly relevant at the present stage, as the age of bridges is constantly increasing, and the resource of their elements is being expiring.Due to limited funding, the economic and time components of the designed models have a significant impact on the quality of performed calculations and the determination of the optimal strategy for performing of repairing work in specified conditions. The choice of planned works is determined during repairing plans development, both for evaluation of the current state of bridges and for determination of predicted bridge repairing terms.Purpose. the purpose of the work is the development of further optimization of the mode of repairs plan development to eliminate existing defects of bridges.Materials and methods. During the determination of repairs cost in the Analytical Expert Bridge Management System (AESUM), the average norms of the work volume were used. This method was limited by the fact that cost calculations were constant and did not consider actual defects of the bridges. The experience of the constructed bridges operation over 40–50 years revealed a significant number of various defects of structure, mainly of spans and piers. The causes of defects are long-term operation without proper maintenance, as well as a number of shortcomings during the design and construction of bridges. In order to further mode optimization of repair plans development, the existing defects on the bridges were studied from the point of view of their impact on the further destruction of certain elements of the bridge, or the facility as a whole, on the acceleration of this process. Such defects have been identified as high risk defects.Results. Scientists of «DerzhdorNDI» SE have developed and applied the technique of repair cost determination by formation of works complex to eliminate existing defects at the inspected facilities. A module for bridge repair planning has been developed considering the need for priority elimination of high risk defects.Conclusions. The technique of repairs cost determination was developed, as well as the module for bridge repair planning considering the need for priority elimination of high risk defects.Keywords: highway bridge, Analytical Expert Bridge Management System (AESUM), repairs cost determination, defect on bridges.
M.P. Shulgin State Road Research Institute State Enterprise
Title: Repair programs development taking into account the presence of high-risk defects on bridges
Description:
Introduction.
In recent years in Ukraine, the weight and traffic volume of vehicles on the roads have increased significantly.
Most of the bridges that are operating on these roads were built according to norms, the design loadings of which are not corresponding to the modern loadings on transport facilities.
Problem Statement.
The issue of bridges operation with defects of the structure in the condition of limited funding of the road industry become particularly relevant at the present stage, as the age of bridges is constantly increasing, and the resource of their elements is being expiring.
Due to limited funding, the economic and time components of the designed models have a significant impact on the quality of performed calculations and the determination of the optimal strategy for performing of repairing work in specified conditions.
The choice of planned works is determined during repairing plans development, both for evaluation of the current state of bridges and for determination of predicted bridge repairing terms.
Purpose.
the purpose of the work is the development of further optimization of the mode of repairs plan development to eliminate existing defects of bridges.
Materials and methods.
During the determination of repairs cost in the Analytical Expert Bridge Management System (AESUM), the average norms of the work volume were used.
This method was limited by the fact that cost calculations were constant and did not consider actual defects of the bridges.
The experience of the constructed bridges operation over 40–50 years revealed a significant number of various defects of structure, mainly of spans and piers.
The causes of defects are long-term operation without proper maintenance, as well as a number of shortcomings during the design and construction of bridges.
In order to further mode optimization of repair plans development, the existing defects on the bridges were studied from the point of view of their impact on the further destruction of certain elements of the bridge, or the facility as a whole, on the acceleration of this process.
Such defects have been identified as high risk defects.
Results.
Scientists of «DerzhdorNDI» SE have developed and applied the technique of repair cost determination by formation of works complex to eliminate existing defects at the inspected facilities.
A module for bridge repair planning has been developed considering the need for priority elimination of high risk defects.
Conclusions.
The technique of repairs cost determination was developed, as well as the module for bridge repair planning considering the need for priority elimination of high risk defects.
Keywords: highway bridge, Analytical Expert Bridge Management System (AESUM), repairs cost determination, defect on bridges.
Related Results
Concomitant Medial Meniscal Root Repair with Extrusion Repair (Centralization Technique)
Concomitant Medial Meniscal Root Repair with Extrusion Repair (Centralization Technique)
Background:
Meniscal extrusion is a phenomenon in which a degenerative posterior horn tear, radial tear, or root tear results in displacement of the body of the meniscu...
Alts and Automediality: Compartmentalising the Self through Multiple Social Media Profiles
Alts and Automediality: Compartmentalising the Self through Multiple Social Media Profiles
IntroductionAlt, or alternative, accounts are secondary profiles people use in addition to a main account on a social media platform. They are a kind of automediation, a way of rep...
ANALYTICAL INFORMATION OF THE AESUM SOFTWARE COMPLEX REGARDING BRIDGES AS OF 2022
ANALYTICAL INFORMATION OF THE AESUM SOFTWARE COMPLEX REGARDING BRIDGES AS OF 2022
Introduction. Effective development and maintenance of transport infrastructure is the key to the strategic development of the state. Bridges are the objects of critical infrastruc...
China's Major Bridges
China's Major Bridges
<p>In response to continuous economic development over the past 30 years, China has mobilized a program of large scale bridge construction. The technology of various types of...
Groin hernia surgery in women : outputs, factors, methods and cost-effectiveness
Groin hernia surgery in women : outputs, factors, methods and cost-effectiveness
<p dir="ltr">There is inequity in access to surgical treatment and quality of care globally and this is more pronounced in low-and middle-income countries (LMICs) especially ...
Groin hernia surgery in women : outputs, factors, methods and cost-effectiveness
Groin hernia surgery in women : outputs, factors, methods and cost-effectiveness
<p dir="ltr">There is inequity in access to surgical treatment and quality of care globally and this is more pronounced in low-and middle-income countries (LMICs) especially ...
Abstract A21: Enhancing chemotherapeutic responses in CNS malignancy through suppression of hyperactive DNA damage repair pathways
Abstract A21: Enhancing chemotherapeutic responses in CNS malignancy through suppression of hyperactive DNA damage repair pathways
Abstract
Introduction: We are targeting DNA repair pathways to enhance existing chemoradiotherapeutic strategies against medulloblastoma (MB) and malignant glioma (M...
A Conversation Analysis of Repair Trouble Sources, Inadequacy and Positions in the Iraqi University Viva Discussions in English
A Conversation Analysis of Repair Trouble Sources, Inadequacy and Positions in the Iraqi University Viva Discussions in English
Oral interaction is sometimes not articulated by its participants as perfect as they project. The unsuccessful instances of talk in exchange may cause serious communicative breakdo...

