Development of In-Line PLETs for Tupi Pilot Project:Challenges and Lessons Learned
View through CrossRef
Abstract
NOTE: The TUPI field name has changed to LULA field; therefore hereafter we will refer to it by the current name LULA.
This paper will describe the challenges, experience and lessons learned on the development of the In-Line PLETs, for the Lula Pilot Project. The project used the first of its kind In-Line PLET and installation methodologies for Brazil's record ultra-deepwater field Lula. The Lula Pilot Gas Export Pipeline is an 18?? diameter×218 Km Pipeline connecting FPSO Cidade de Angra dos Reis to Mexilhão Platform (PMXL-1). The subsea equipment used on the project were the following: Deepwater PLEM, In-Line PLET, In-Line Wye, Shallow Water PLEM and Jumper Connectors.
There were many new challenges on the project. The first was to design an In-Line PLET and In-Line Wye that were small enough to fit inside the tensioner of an S-lay vessel and strong enough to withstand the installation loads of Lula's 2145 meters water depth. The In-Line PLET and In-Line Wye both have identical configurations that consist of Stress Joints, Pipe-in-Pipe Joints, Swivels, Wye, Ball Valve and Tie-in Hub. But the In-Line PLET's Wye straight brach leg was designed into a Dead Leg to be used as an anchor point to tie-in the additional 320 feet of pipe and laying head needed to set down the In-Line PLET. Addition items included Pipe-in-Pipe Joints, Stress Joints and Swivel. These were used to reduce the stress on the pipeline and equipment during installation.
Another challenge was coordinating the project with the customer and the installation contractor. In addition to the multiple customers, there were multiple manufacturing sites for the equipment, including Houston, Aberdeen, Milan, Paris, Victoria, and Rio.
Design Qualification Testing was completed on the 18?? Intergal Collet Connector and a 10?? Annular MCV Connector. The 18?? Collet Connector was used to tie-in the rigid jumper and the 10?? Annular MCV Connector was used for the Flexible Jumper tie-in. Finally, this paper will describe the successful deployment and installation of the In-Line PLETs, which helped to launch Brazil's record setting Pre-Salt Discovery Lula.
Introduction
A well know subsea layout for Pipeline termination is the use of PLETs connected by Rigid Jumpers to PLEMs. PLEMs can be placed anywhere along the pipeline to allow a future connection to the main Pipeline. An alternative to avoid PLEMs in the middle of the Pipeline and therefore reduce the installation time is the use of a system that can be welded to the Pipeline and deployed in line with the Pipeline, or, In-line systems.
Title: Development of In-Line PLETs for Tupi Pilot Project:Challenges and Lessons Learned
Description:
Abstract
NOTE: The TUPI field name has changed to LULA field; therefore hereafter we will refer to it by the current name LULA.
This paper will describe the challenges, experience and lessons learned on the development of the In-Line PLETs, for the Lula Pilot Project.
The project used the first of its kind In-Line PLET and installation methodologies for Brazil's record ultra-deepwater field Lula.
The Lula Pilot Gas Export Pipeline is an 18?? diameter×218 Km Pipeline connecting FPSO Cidade de Angra dos Reis to Mexilhão Platform (PMXL-1).
The subsea equipment used on the project were the following: Deepwater PLEM, In-Line PLET, In-Line Wye, Shallow Water PLEM and Jumper Connectors.
There were many new challenges on the project.
The first was to design an In-Line PLET and In-Line Wye that were small enough to fit inside the tensioner of an S-lay vessel and strong enough to withstand the installation loads of Lula's 2145 meters water depth.
The In-Line PLET and In-Line Wye both have identical configurations that consist of Stress Joints, Pipe-in-Pipe Joints, Swivels, Wye, Ball Valve and Tie-in Hub.
But the In-Line PLET's Wye straight brach leg was designed into a Dead Leg to be used as an anchor point to tie-in the additional 320 feet of pipe and laying head needed to set down the In-Line PLET.
Addition items included Pipe-in-Pipe Joints, Stress Joints and Swivel.
These were used to reduce the stress on the pipeline and equipment during installation.
Another challenge was coordinating the project with the customer and the installation contractor.
In addition to the multiple customers, there were multiple manufacturing sites for the equipment, including Houston, Aberdeen, Milan, Paris, Victoria, and Rio.
Design Qualification Testing was completed on the 18?? Intergal Collet Connector and a 10?? Annular MCV Connector.
The 18?? Collet Connector was used to tie-in the rigid jumper and the 10?? Annular MCV Connector was used for the Flexible Jumper tie-in.
Finally, this paper will describe the successful deployment and installation of the In-Line PLETs, which helped to launch Brazil's record setting Pre-Salt Discovery Lula.
Introduction
A well know subsea layout for Pipeline termination is the use of PLETs connected by Rigid Jumpers to PLEMs.
PLEMs can be placed anywhere along the pipeline to allow a future connection to the main Pipeline.
An alternative to avoid PLEMs in the middle of the Pipeline and therefore reduce the installation time is the use of a system that can be welded to the Pipeline and deployed in line with the Pipeline, or, In-line systems.
Related Results
Laboratory Model Study of Single Five-Spot and Single Injection Well Pilot Waterflooding
Laboratory Model Study of Single Five-Spot and Single Injection Well Pilot Waterflooding
Abstract
Many full-scale waterflooding operations are preceded by pilot floods, one purpose of which is to provide an estimate of recoverable oil. A laboratory mo...
Design, Fabrication, and Installation of the Neptune Export Lateral PLETs
Design, Fabrication, and Installation of the Neptune Export Lateral PLETs
Abstract
As development projects in deep water Gulf of Mexico move further away from existing infrastructure, it becomes advantageous to consider subsea tie-in of...
La « Harangue faicte au Roy par Itapoucou » : un discours politique en langue tupi (France, XVIIe)
La « Harangue faicte au Roy par Itapoucou » : un discours politique en langue tupi (France, XVIIe)
Le discours adressé au roi de france Louis XIII, en 1614, par un Indien du Maragnan en qualité d'ambassadeur nous permet d'observer la langue et la rhétorique tupi de l'époque et s...
Woningcorporaties en Vastgoedontwikkeling
Woningcorporaties en Vastgoedontwikkeling
This summary highlights the findings of the PhD-thesis ‘Woningcorporaties en Vastgoedontwikkeling: Fit for Use’ (‘Housing associations and Real Estate Development: Fit for Use?’). ...
IOR Pilot Evaluation in a Brown-Field Fractured Reservoir Using Data Analytics of Reservoir Simulation Results
IOR Pilot Evaluation in a Brown-Field Fractured Reservoir Using Data Analytics of Reservoir Simulation Results
Abstract
A well-designed pilot is instrumental in reducing uncertainty for the full-field implementation of improved oil recovery (IOR) operations. Traditional model...
Comparison of physical fitness status of Ethiopian youth football players trained by coaches from formal and informal coach learning systems
Comparison of physical fitness status of Ethiopian youth football players trained by coaches from formal and informal coach learning systems
The purpose of the present study was to compare physical fitness status (agility, flexibility, speed, and strength endurance) of Ethiopian youth under-17 football players trained b...
Pre-Salt Santos Basin -Extended Well Test and Production Pilot in the Tupi Area - The Planning Phase
Pre-Salt Santos Basin -Extended Well Test and Production Pilot in the Tupi Area - The Planning Phase
Abstract
This paper describes how Petrobras is assessing the realistic pre-salt potential of the Santos Basin, offshore Brazil, in water depths between 1,900 and ...
Piece by piece: Collaborative mosaic-making for inclusive policy development
Piece by piece: Collaborative mosaic-making for inclusive policy development
This report sets out the findings from one of four projects commissioned by Wellcome Policy Lab to pilot creative approaches to policy development. In this project, Scientia Script...