Auger's Lateral Mooring System: Key Learnings
View through CrossRef
ABSTRACT
Installation of the Auger TLP was completed in February 1994 with fit production in April 1994. The lateral mooring system (LMS) was critical to the successful mating of the hull and deck and installation of the tendons. The LMS is currently used to position the TLP over the wells during drilling operations and to assist the tendons in holding station during storm events. This paper describes the most significant lessons learned duringdesign, fabrication, installation and operation of the LMS. me results presented in this paper will be useful to mooring system designers, component manufacturers, installation contractors and other operators pursuing floating system options for development of deepwater fields.
Specific results to be addressed include design criteria component selection, corrosion protection systems, component manufacture, anchor performance, locked coil failures, buoy pin retainer failures, line tension measurements, installation procedures and offshore operations. ?the most significant aspect of this paper will be to provide the industry with the key Iearning from the Auger LMS so that deepwater mooring systems maybe further improved for future applications
INTRODUCTION
Auger's LMS is a combination wide chain mooring system with submersible buoys and drag embedment anchors secured on the TLP by linear winches (See Figure 1). The entire winching system, except for the bending shoes, is located in the TLP hull columns (See Figure 2), Each of the eight mooring lines has a minimum breaking strength of 2900 klps. All components are corrosion protected, except the chain, and designed for a 30 year service life, An overview of the Auger LMS is presented in Ref. 1. A general discussion of lateral mooring systems for TLPs is presented in Ref. 2.
SYSTEM DESIGN
Numerous studies were performed in-house, with mooring component manufacturers, and with outside consultants to optimize the LMS configuration in terms of performance, COSL weight and schedule. Joint Industry Studies conducted by Noble Den ton (DMOOR mooring analysis program, Wire Fatigue, Chain Fatigue) and Aker Omega (Large Scale Anchor Test) provided valuable information that influenced the LMS design. The LMS design also built on the experience gained from the Lena guyed tower (Ref. 3) and Placid FPS (Ref. 4) mooring systems.
Design Criteria
The LMS was designed by Shell in accordance with API RP 2FP1 (Ref. 5) and additional criteria developed within Shell. Limits were placed on ?TLP offset line tension, anchor loads, buoy depth and fatigue for both operating and design conditions. Higher safety factors were specific for the operating condition where the LMS is used to pull the TLP over an outermost well. Line dynamics and line fatigue were analyzed during the design process. A detailed description of the LMS design criteria is presented in Ref. 1.
Title: Auger's Lateral Mooring System: Key Learnings
Description:
ABSTRACT
Installation of the Auger TLP was completed in February 1994 with fit production in April 1994.
The lateral mooring system (LMS) was critical to the successful mating of the hull and deck and installation of the tendons.
The LMS is currently used to position the TLP over the wells during drilling operations and to assist the tendons in holding station during storm events.
This paper describes the most significant lessons learned duringdesign, fabrication, installation and operation of the LMS.
me results presented in this paper will be useful to mooring system designers, component manufacturers, installation contractors and other operators pursuing floating system options for development of deepwater fields.
Specific results to be addressed include design criteria component selection, corrosion protection systems, component manufacture, anchor performance, locked coil failures, buoy pin retainer failures, line tension measurements, installation procedures and offshore operations.
?the most significant aspect of this paper will be to provide the industry with the key Iearning from the Auger LMS so that deepwater mooring systems maybe further improved for future applications
INTRODUCTION
Auger's LMS is a combination wide chain mooring system with submersible buoys and drag embedment anchors secured on the TLP by linear winches (See Figure 1).
The entire winching system, except for the bending shoes, is located in the TLP hull columns (See Figure 2), Each of the eight mooring lines has a minimum breaking strength of 2900 klps.
All components are corrosion protected, except the chain, and designed for a 30 year service life, An overview of the Auger LMS is presented in Ref.
1.
A general discussion of lateral mooring systems for TLPs is presented in Ref.
2.
SYSTEM DESIGN
Numerous studies were performed in-house, with mooring component manufacturers, and with outside consultants to optimize the LMS configuration in terms of performance, COSL weight and schedule.
Joint Industry Studies conducted by Noble Den ton (DMOOR mooring analysis program, Wire Fatigue, Chain Fatigue) and Aker Omega (Large Scale Anchor Test) provided valuable information that influenced the LMS design.
The LMS design also built on the experience gained from the Lena guyed tower (Ref.
3) and Placid FPS (Ref.
4) mooring systems.
Design Criteria
The LMS was designed by Shell in accordance with API RP 2FP1 (Ref.
5) and additional criteria developed within Shell.
Limits were placed on ?TLP offset line tension, anchor loads, buoy depth and fatigue for both operating and design conditions.
Higher safety factors were specific for the operating condition where the LMS is used to pull the TLP over an outermost well.
Line dynamics and line fatigue were analyzed during the design process.
A detailed description of the LMS design criteria is presented in Ref.
1.
Related Results
Evaluation of Advanced Fibers for Deepwater Synthetic Fiber Mooring Systems
Evaluation of Advanced Fibers for Deepwater Synthetic Fiber Mooring Systems
Abstract
Mooring systems utilizing polyester ropes have facilitated exploration and production of deepwater fields and represent a step-change in mooring system d...
Dynamic Positioning in Single-Point Moorings
Dynamic Positioning in Single-Point Moorings
ABSTRACT
This paper deals with the concept of and a system for complete control of the slowly varying bow motion of a bow-moored ship using dynamic positioning.
...
Mooring Safety Assessment Using Reliability Techniques
Mooring Safety Assessment Using Reliability Techniques
ABSTRACT
The paper deals with the reliability of offshore mooring systems. Reliability techniques have been applied to assess mooring systems designed by the quas...
Dynamic Response of a SPAR-Type Floating Wind Turbine Foundation with Taut Mooring System
Dynamic Response of a SPAR-Type Floating Wind Turbine Foundation with Taut Mooring System
Compared with the traditional catenary or semi-taut mooring lines, the taut mooring system is more advantageous in many aspects, such as reduction of mooring line loads, erosion an...
Analysis of Catenary Mooring Systems Based on Truncated Mooring Experiments
Analysis of Catenary Mooring Systems Based on Truncated Mooring Experiments
Considering the activities of floating systems pushing to the ultra-deepwater, the full scale mooring system needs to be truncated in order to carry out model tests in wave basin w...
Numerical and Experimental Study of Mooring Systems with Clump Weights for Floating Wind Turbines
Numerical and Experimental Study of Mooring Systems with Clump Weights for Floating Wind Turbines
The transition towards a low-carbon economy is emerging as one of the most pressing challenges of our era. Among the various sustainable technologies, offshore wind energy stands o...
Reliability of Mooring Systems: Application to Polyester Moorings
Reliability of Mooring Systems: Application to Polyester Moorings
Abstract
The trend to deep water oilfields has accelerated the development of mooring systems. Future moorings requirements represent a considerable step out on c...
Radiationless Auger‐Like Electronic Transitions in Biomolecules: Bio‐Auger Process
Radiationless Auger‐Like Electronic Transitions in Biomolecules: Bio‐Auger Process
AbstractNonradiative relaxation process caused by the interaction between electrons in biomolecules following radiative absorption is discussed herein. The process is akin to Auger...