The Development of an FPSO for the Deepwater Gulf of Mexico

View through CrossRef
Abstract This paper presents the issues specific to the engineering and operation of FPSOs in the US Gulf of Mexico, and discusses the design of one FPSO currently under development and how it addresses those issues. The areas of the FPSO design which are discussed in this paper include:Regulatory and environmental requirementsVessel selection and refurbishment for design life extensionRiser and station keeping/mooring design for hurricane and loop current conditions in deepwaterTopsides design including associated gas disposalOil import and export facilitiesShuttle tanker requirements The design basis of this FPSO has been developed with the intent of enabling the unit to be easily redeployable in different locations, either as an Early Production System (EPS) for large fields, or a Full Field Development on marginal or medium size fields (30- 80,000 bopd). Different technologies are compared and their design and operational limitations identified, for riser design (flexible risers, hybrid riser towers, top tensioned risers, single well riser towers, permanent and disconnectable) and station keeping design, (permanent or disconnectable, dynamic positioning or anchor leg moorings, polyester or wire rope mooring systems). Those aspects of the design which require technology new to the Gulf of Mexico, will be highlighted and comparable applications of the technology elsewhere in the world, if applicable, identified. There has been an increased interest recently in the application of FPSOs for the development of deepwater fields in the Gulf of Mexico. Damage to offshore facilities and the pipeline infrastructure during recent hurricane seasons, has made the benefits of the FPSO concept more apparent, with its large onboard oil storage capacity and capability to offload via shuttle tankers or pipelines, and its ability to disconnect from risers/moorings and avoid the hurricane conditions design case. Understanding the issues relative to the use of FPSOs in the Gulf of Mexico and developing a design, which utilizes the proven technology of FPSOs elsewhere in the world, is key to applying this concept successfully in this region. Introduction So far there have been no FPSOs installed in the US portion of the Gulf of Mexico (GoM) even though the concept has been increasingly selected for field developments elsewhere in the world. What are the key issues when reviewing the suitability of an FPSO for this region, and what has changed recently to affect the selection process? The damage caused to the offshore units and pipelines system by hurricanes Ivan, Katrina, and Rita, plus the continuing exploration success in the ultra deepwater beyond the continental shelf, are two of the main drivers towards the current interest in FPSOs in the Gulf of Mexico. The ability of the FPSO to be designed to disconnect and sail away prior to the arrival of a hurricane, and the fact it is not dependent on the pipeline network to transport oil, makes it an inherently more robust and safe design concept.
Title: The Development of an FPSO for the Deepwater Gulf of Mexico
Description:
Abstract This paper presents the issues specific to the engineering and operation of FPSOs in the US Gulf of Mexico, and discusses the design of one FPSO currently under development and how it addresses those issues.
The areas of the FPSO design which are discussed in this paper include:Regulatory and environmental requirementsVessel selection and refurbishment for design life extensionRiser and station keeping/mooring design for hurricane and loop current conditions in deepwaterTopsides design including associated gas disposalOil import and export facilitiesShuttle tanker requirements The design basis of this FPSO has been developed with the intent of enabling the unit to be easily redeployable in different locations, either as an Early Production System (EPS) for large fields, or a Full Field Development on marginal or medium size fields (30- 80,000 bopd).
Different technologies are compared and their design and operational limitations identified, for riser design (flexible risers, hybrid riser towers, top tensioned risers, single well riser towers, permanent and disconnectable) and station keeping design, (permanent or disconnectable, dynamic positioning or anchor leg moorings, polyester or wire rope mooring systems).
Those aspects of the design which require technology new to the Gulf of Mexico, will be highlighted and comparable applications of the technology elsewhere in the world, if applicable, identified.
There has been an increased interest recently in the application of FPSOs for the development of deepwater fields in the Gulf of Mexico.
Damage to offshore facilities and the pipeline infrastructure during recent hurricane seasons, has made the benefits of the FPSO concept more apparent, with its large onboard oil storage capacity and capability to offload via shuttle tankers or pipelines, and its ability to disconnect from risers/moorings and avoid the hurricane conditions design case.
Understanding the issues relative to the use of FPSOs in the Gulf of Mexico and developing a design, which utilizes the proven technology of FPSOs elsewhere in the world, is key to applying this concept successfully in this region.
Introduction So far there have been no FPSOs installed in the US portion of the Gulf of Mexico (GoM) even though the concept has been increasingly selected for field developments elsewhere in the world.
What are the key issues when reviewing the suitability of an FPSO for this region, and what has changed recently to affect the selection process? The damage caused to the offshore units and pipelines system by hurricanes Ivan, Katrina, and Rita, plus the continuing exploration success in the ultra deepwater beyond the continental shelf, are two of the main drivers towards the current interest in FPSOs in the Gulf of Mexico.
The ability of the FPSO to be designed to disconnect and sail away prior to the arrival of a hurricane, and the fact it is not dependent on the pipeline network to transport oil, makes it an inherently more robust and safe design concept.

Related Results

FPSO EIS Results and Record of Decision
FPSO EIS Results and Record of Decision
Abstract The United States Department of the Interior (DOI), Minerals Management Service (MMS) prepared an environmental impact statement (EIS)1 to evaluate poten...
Floating Production, Storage, and Offloading Systems in the Gulf of Mexico OCS: A Regulatory Perspective
Floating Production, Storage, and Offloading Systems in the Gulf of Mexico OCS: A Regulatory Perspective
Abstract Floating Production, Storage, and Offloading (FPSO) systems represent an untested technology in the U.S. Gulf of Mexico (GOM) Outer Continental Shelf. Th...
FPSO Environmental Impact Statement: Government and Industry Cooperative Effort
FPSO Environmental Impact Statement: Government and Industry Cooperative Effort
Abstract This paper reviews the cooperative efforts between the Federal Government and the offshore energy industry to identify and evaluate the technical and env...
New Tendon and Riser Technologies Improve TLP Competitiveness in Ultra- Deepwater
New Tendon and Riser Technologies Improve TLP Competitiveness in Ultra- Deepwater
Abstract The extensive industry experience with design, fabrication, installation, and operation of TLPs in water depths up to 4,000 ft has demonstrated the flexi...
FPSO's Today: What is the Optimum Concept?
FPSO's Today: What is the Optimum Concept?
ABSTRACT FPSO technology over the past years has rapidly evolved from tanker based units with classical mooring systems to purpose-shaped new built vessels equipp...
The Sanha LPG FPSO
The Sanha LPG FPSO
Abstract The FPSO industry will soon have the first LPG FPSO in operation. The SANHA LPG FPSO is the first gas related FPSO. With the installation of the LPG FPSO...
The Challenges and Opportunities of FPSO Relocations
The Challenges and Opportunities of FPSO Relocations
Abstract The first FPSO relocation project was completed 18 years ago (SBM's FPSO II), and since that time there has been a steady rise in the number and complexi...