Study of Transformer Lifetime Due to Loading Process on 20 KV Distribution Line

View through CrossRef
Power transformer is very important in electric power system due to its function to raise or lower the voltage according to its designation. On the power side, the power transformer serves to raise voltage to be transmitted to the transmission line. On the transmission side, the power transformer serves to distribute the voltage between the main substations or down to the distribution voltage. On the distribution side, the stresses are channeled to large customers or lowered to serve small and medium customers. As the power transformer is so importance, it is necessary to protect against disturbance, as well as routine and periodic maintenance, so that the power transformer can operate in accordance with the planned time. Some factors that affect the duration of the power transformer is the ambient temperature, transformer oil temperature, and the pattern of load. Load that exceeds the maximum efficiency of the transformer which is 80% of its capacity will cause an increase in transformer oil temperature. Transformer oil, other than as a cooling medium also serves as an insulator. Increasing the temperature of transformer oil will affect its ability as an isolator that is to isolate the parts that are held in the transformer, such as iron core and the coils. If this is prolonged and not handled properly, it will lead to failure / breakdown of insulation resulting in short circuit between parts so that the power transformer will be damaged. PLN data indicates that the power transformer is still burdened exceeding maximum efficiency especially operating in the work area of PLN South Bali Area. The results of this study, on distribution transformers with different loads, in DS 137, DS 263 and DS 363, show that DS 363 transformer with loading above 80% has the shortest residual life time compared to DS 263 and DS 137 which loading less than 80%.
Title: Study of Transformer Lifetime Due to Loading Process on 20 KV Distribution Line
Description:
Power transformer is very important in electric power system due to its function to raise or lower the voltage according to its designation.
On the power side, the power transformer serves to raise voltage to be transmitted to the transmission line.
On the transmission side, the power transformer serves to distribute the voltage between the main substations or down to the distribution voltage.
On the distribution side, the stresses are channeled to large customers or lowered to serve small and medium customers.
As the power transformer is so importance, it is necessary to protect against disturbance, as well as routine and periodic maintenance, so that the power transformer can operate in accordance with the planned time.
Some factors that affect the duration of the power transformer is the ambient temperature, transformer oil temperature, and the pattern of load.
Load that exceeds the maximum efficiency of the transformer which is 80% of its capacity will cause an increase in transformer oil temperature.
Transformer oil, other than as a cooling medium also serves as an insulator.
Increasing the temperature of transformer oil will affect its ability as an isolator that is to isolate the parts that are held in the transformer, such as iron core and the coils.
If this is prolonged and not handled properly, it will lead to failure / breakdown of insulation resulting in short circuit between parts so that the power transformer will be damaged.
PLN data indicates that the power transformer is still burdened exceeding maximum efficiency especially operating in the work area of PLN South Bali Area.
The results of this study, on distribution transformers with different loads, in DS 137, DS 263 and DS 363, show that DS 363 transformer with loading above 80% has the shortest residual life time compared to DS 263 and DS 137 which loading less than 80%.

Related Results

Automatic Load Sharing of Transformer
Automatic Load Sharing of Transformer
Transformer plays a major role in the power system. It works 24 hours a day and provides power to the load. The transformer is excessive full, its windings are overheated which lea...
High frequency modeling of power transformers under transients
High frequency modeling of power transformers under transients
This thesis presents the results related to high frequency modeling of power transformers. First, a 25kVA distribution transformer under lightning surges is tested in the laborator...
Simulation modeling study on short circuit ability of distribution transformer
Simulation modeling study on short circuit ability of distribution transformer
Abstract Under short circuit condition, the oil immersed distribution transformer will endure combined electro-thermal stress, eventually lead to the mechanical dama...
ANALISIS PENGARUH MASA OPERASIONAL TERHADAP PENURUNAN KAPASITAS TRANSFORMATOR DISTRIBUSI DI PT PLN (PERSERO)
ANALISIS PENGARUH MASA OPERASIONAL TERHADAP PENURUNAN KAPASITAS TRANSFORMATOR DISTRIBUSI DI PT PLN (PERSERO)
One cause the interruption of transformer is loading that exceeds the capabilities of the transformer. The state of continuous overload will affect the age of the transformer and r...
LIFE CYCLE OF TRANSFORMER 110/X KV AND ITS VALUE
LIFE CYCLE OF TRANSFORMER 110/X KV AND ITS VALUE
In a deregulated environment, power companies are in the constant process of reducing the costs of operating power facilities, with the aim of optimally improving the quality of de...
Analysis of Transformer Loading Profile at 11/0.4 kV Distribution Voltage Network at Hospital Melaka
Analysis of Transformer Loading Profile at 11/0.4 kV Distribution Voltage Network at Hospital Melaka
On distribution site, to offer customers with comfort in service, the dependability, stability, and residual lifetime of the transformer is important part to consider. The factors ...
STL, A New Approach to Field Development
STL, A New Approach to Field Development
ABSTRACT Submerged Turret and Loading (STL) is an efficient and safe system for offshore loading and storage. The loading system can effectively be adapted to spe...
Experimental Investigation of Vapour Phase Drying System
Experimental Investigation of Vapour Phase Drying System
Electrical equipment such as power transformer is required to withstand high voltages during the process of power transfer from primary to secondary. So it is always required to ha...