Multiple Water and Sand Leakage Model Tests for Shield Tunnel
View through CrossRef
Water and sand leakage in shield tunnels has become more of a research interest in recent years. On the other hand, accidents involving underground engineering can take many forms and occur often. These accidents pose a risk to people's lives as well as their property, and it is imperative that study on underground engineering catastrophes be conducted without delay. At the moment, there is a deficiency in the number of systematic research and theoretical framework that pertains to the evolution mechanism of tunnel leakage and erosion disaster. In this paper, a technique of indoor model test for disaster and erosion in shield tunnels is utilized in this study to investigate the process of crater, water, and sand leakage evolution in shield tunnels. The change in water pressure at the leaking joint is inversely proportional to the magnitude of the water input rate, and the change in soil pressure is inversely proportional to the distance from the leakage joint. Both changes occurred in the same direction. Notably, the soil's initial effective stress was also considered to maintain compatibility with actual engineering works. The preliminary findings suggested that soil-effective stress may cause erosion resulting to the soil arching effect. Tests with one and two leakage spots were carried out using this foundation. Compared to the scenario where two leakage sites are opened simultaneously, it was discovered that opening the two leakage points one after the other might result in a more extensive erosion area of superposition. The double leakage points test results indicate that the point where leakage occurs first causes another leakage point because the erosion area created when two leakage points are opened successively will be larger than the erosion area created when two leakage points are opened simultaneously. When two leakage points under a tunnel are close to each other, the width and depth of the soil erosion groove under the tunnel caused by the two leakage points leaking one after another are significantly larger than those caused by two leakage points leaking simultaneously and are also substantially larger than a single leakage point. After a leakage disaster occurs in the tunnel, the water and soil pressure near the leakage point will continue to decrease. The closer to the leakage point, the greater the reduction. Until the leakage erosion converges, the water and soil pressure will tend to stabilize.
Title: Multiple Water and Sand Leakage Model Tests for Shield Tunnel
Description:
Water and sand leakage in shield tunnels has become more of a research interest in recent years.
On the other hand, accidents involving underground engineering can take many forms and occur often.
These accidents pose a risk to people's lives as well as their property, and it is imperative that study on underground engineering catastrophes be conducted without delay.
At the moment, there is a deficiency in the number of systematic research and theoretical framework that pertains to the evolution mechanism of tunnel leakage and erosion disaster.
In this paper, a technique of indoor model test for disaster and erosion in shield tunnels is utilized in this study to investigate the process of crater, water, and sand leakage evolution in shield tunnels.
The change in water pressure at the leaking joint is inversely proportional to the magnitude of the water input rate, and the change in soil pressure is inversely proportional to the distance from the leakage joint.
Both changes occurred in the same direction.
Notably, the soil's initial effective stress was also considered to maintain compatibility with actual engineering works.
The preliminary findings suggested that soil-effective stress may cause erosion resulting to the soil arching effect.
Tests with one and two leakage spots were carried out using this foundation.
Compared to the scenario where two leakage sites are opened simultaneously, it was discovered that opening the two leakage points one after the other might result in a more extensive erosion area of superposition.
The double leakage points test results indicate that the point where leakage occurs first causes another leakage point because the erosion area created when two leakage points are opened successively will be larger than the erosion area created when two leakage points are opened simultaneously.
When two leakage points under a tunnel are close to each other, the width and depth of the soil erosion groove under the tunnel caused by the two leakage points leaking one after another are significantly larger than those caused by two leakage points leaking simultaneously and are also substantially larger than a single leakage point.
After a leakage disaster occurs in the tunnel, the water and soil pressure near the leakage point will continue to decrease.
The closer to the leakage point, the greater the reduction.
Until the leakage erosion converges, the water and soil pressure will tend to stabilize.
Related Results
Sand Production Management
Sand Production Management
Abstract
Sand production may be inevitable in many fields that have a relatively lower formation strength. Sand erosion and settling predictions and sand monitori...
Multiple Water and Sand Leakage Model Tests for Shield Tunnels
Multiple Water and Sand Leakage Model Tests for Shield Tunnels
Water and sand leakage in shield tunnels has become more of a research interest in recent years. On the other hand, accidents involving underground engineering can take many forms ...
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Abstract
Due to the unique spatial structure, stress transfer mechanism, and construction disturbance characteristics of ultra-small spacing parallel overlapping tu...
The Effect of Dry Density on Shear Strength Parameters of Ravi, Chenab and Lawrencepur Sand in Dry and Saturated Conditions
The Effect of Dry Density on Shear Strength Parameters of Ravi, Chenab and Lawrencepur Sand in Dry and Saturated Conditions
Soil is the soul material for any civil engineering structure. In general, there are two types of soil; cohesive soil and silty sand. Silty sand is mineral soil that exhibits granu...
Sand Consolidation Preflush Dynamics
Sand Consolidation Preflush Dynamics
Penberthy Jr., W.L., SPE-AIME, Penberthy Jr., W.L., SPE-AIME, Exxon Production Research Co. Shaughnessy, C.M., SPE-AIME, Exxon Production Research Co. Gruesbeck, C., SPE-AIME, Exxo...
Evaluating the Sand-Trapping Efficiency of Sand Fences Using a Combination of Wind-Blown Sand Measurements and UAV Photogrammetry at Tottori Sand Dunes, Japan
Evaluating the Sand-Trapping Efficiency of Sand Fences Using a Combination of Wind-Blown Sand Measurements and UAV Photogrammetry at Tottori Sand Dunes, Japan
Fences are commonly used in coastal regions to control wind-blown sand. Sand-trapping fences and sand-stabilizing fences have been installed at the Tottori Sand Dunes, Tottori Pref...
A Sand Failure Test Can Cut Both Completion Costs And The Number Of Developement Wells
A Sand Failure Test Can Cut Both Completion Costs And The Number Of Developement Wells
Abstract
The objective of this Sand Failure Test was to determine whether initial sand control is necessary on a poorly consolidated gas field, or whether it can ...
Field Implications from Full-Scale Sand Production Experiments
Field Implications from Full-Scale Sand Production Experiments
Abstract
During 1992 and 1993, Shell (SIEP), British Petroleum (Sunbury), Elf Aquitaine and Schlumberger Perforating & Testing performed multiple-shot experim...