Ekpe Gas Compression Project - Float-Over Deck Installation

View through CrossRef
Abstract ETPM successfully installed the Ekpe Gas Compression deck offshore Nigeria for the NIGERIA NATIONAL PETROLEUM CORPORATION AND MOBIL PRODUCING NIGERIA JOINT VENTURE in June 1997, using for the first time the shockless Smart-Leg system. The Ekpe Gas compression platform is located in a water depth of 50 meters and is subjected to long period swell conditions common to offshore West Africa, which causes the movements of cargo barges to have large amplitudes. This activity involved positioning the cargo barge within the jacket structure, centering the deck over the piled jacket, and mating the legs of the 4 100 tonne deck to the piles. For the first time, passive hydraulic devices were used to neutralize the vertical movements of the barge and to transfer the deck weight from the cargo barge to the piled jacket structure. The Smart-Leg jacks allowed the mating of each deck leg onto the corresponding jacket pile to take place at the precise time when the deck leg vertical speed is zero, therefore eliminating the kinetic energy and the risk of impact. The deck mating was completed in a few seconds, less than the swell period. After the deck was installed, all the hydraulic devices were retrieved, ready to be used for another project. This paper presents the installation procedures, an operational description of the major hardware employed, and details of the on-site monitoring systems used to accomplish float-over deck installation. Factors which influenced the selection of the float-over installation method are also discussed. Introduction In 1993, Smart-Leg existed only as a concept patented by ETPM. It took 4 years to develop the system, build the equipment and perform the first operation. The advantages of the integrated deck concept for large offshore platforms are well known. These decks, however, can be quite heavy and some areas in the world may be far away from the usual operating scenes of the large crane vessels necessary if a conventional lift technique is selected for the installation. Floatation methods offer an alternative solution for installation, but few methods permit the installation of heavy integrated deck in long swells where the movements of the cargo barge have large amplitudes. Floatation methods are limited by the difficulty of maintaining the cargo barge steady inside the jacket or by the shocks to be absorbed during the mating operation. Rather than absorbing the shocks, the Smart-Leg floatation method aims at eliminating them. Passive and retrievable jacks are used to progressively freeze the motion of the cargo barge, thus allowing a very large deck to be installed in significant swell conditions. During the abandonmentphase, the deck can be removed by reversing the operation. Offshore West Africa, the crane capacity of local construction vessels is a limitation to heavy deck installation. For a deck installation above 1,200 tonne, one would have to mobilize a heavy duty Semisubmersible Crane Vessel (SSCV) from the North Sea, where these units normally are located. ETPM was determined to find an alternative to using SSCVs, and preferably a solution that can accomodate a wide range of deck sizes and seastate condition.
Title: Ekpe Gas Compression Project - Float-Over Deck Installation
Description:
Abstract ETPM successfully installed the Ekpe Gas Compression deck offshore Nigeria for the NIGERIA NATIONAL PETROLEUM CORPORATION AND MOBIL PRODUCING NIGERIA JOINT VENTURE in June 1997, using for the first time the shockless Smart-Leg system.
The Ekpe Gas compression platform is located in a water depth of 50 meters and is subjected to long period swell conditions common to offshore West Africa, which causes the movements of cargo barges to have large amplitudes.
This activity involved positioning the cargo barge within the jacket structure, centering the deck over the piled jacket, and mating the legs of the 4 100 tonne deck to the piles.
For the first time, passive hydraulic devices were used to neutralize the vertical movements of the barge and to transfer the deck weight from the cargo barge to the piled jacket structure.
The Smart-Leg jacks allowed the mating of each deck leg onto the corresponding jacket pile to take place at the precise time when the deck leg vertical speed is zero, therefore eliminating the kinetic energy and the risk of impact.
The deck mating was completed in a few seconds, less than the swell period.
After the deck was installed, all the hydraulic devices were retrieved, ready to be used for another project.
This paper presents the installation procedures, an operational description of the major hardware employed, and details of the on-site monitoring systems used to accomplish float-over deck installation.
Factors which influenced the selection of the float-over installation method are also discussed.
Introduction In 1993, Smart-Leg existed only as a concept patented by ETPM.
It took 4 years to develop the system, build the equipment and perform the first operation.
The advantages of the integrated deck concept for large offshore platforms are well known.
These decks, however, can be quite heavy and some areas in the world may be far away from the usual operating scenes of the large crane vessels necessary if a conventional lift technique is selected for the installation.
Floatation methods offer an alternative solution for installation, but few methods permit the installation of heavy integrated deck in long swells where the movements of the cargo barge have large amplitudes.
Floatation methods are limited by the difficulty of maintaining the cargo barge steady inside the jacket or by the shocks to be absorbed during the mating operation.
Rather than absorbing the shocks, the Smart-Leg floatation method aims at eliminating them.
Passive and retrievable jacks are used to progressively freeze the motion of the cargo barge, thus allowing a very large deck to be installed in significant swell conditions.
During the abandonmentphase, the deck can be removed by reversing the operation.
Offshore West Africa, the crane capacity of local construction vessels is a limitation to heavy deck installation.
For a deck installation above 1,200 tonne, one would have to mobilize a heavy duty Semisubmersible Crane Vessel (SSCV) from the North Sea, where these units normally are located.
ETPM was determined to find an alternative to using SSCVs, and preferably a solution that can accomodate a wide range of deck sizes and seastate condition.

Related Results

Smart?Leg Computations Validated During the Ekpe Gas Compression Project Float-over Deck Installation
Smart?Leg Computations Validated During the Ekpe Gas Compression Project Float-over Deck Installation
Abstract The Smart?Leg system developed by ETPM ensures the shockless float-over installation of heavy fully-commissioned integrated decks on offshore jacket stru...
Mobile Bay Project Float-On Deck Installations
Mobile Bay Project Float-On Deck Installations
ABSTRACT A float-on deck mating procedure was successfully used instead of a conventional derrick barge lift for installation of the integrated topsides on three ...
Arthit Field Development: Float-over Hardware Design and Issues
Arthit Field Development: Float-over Hardware Design and Issues
Abstract The 17,500 metric ton Arthit PP topsides was successfully installed in December of 2007 in the Gulf of Thailand after a short voyage from Batam Island, I...
Anteo : the Float-over giant
Anteo : the Float-over giant
Abstract Anteo is a "giant" hydraulic system providing one of the most reliable and cost-effective solution to the market demand of Integrated Deck installation b...
Successful Float Over Installation by Portable DP Vessel
Successful Float Over Installation by Portable DP Vessel
ABSTRACT Float over topside installation has become a cost effective alternative for offshore construction over the past 25-30 years, as ever-increasing integrated t...
Snorre TLP Topside Design
Snorre TLP Topside Design
ABSTRACT This paper gives a brief description of the topside facilities and integrated deck structure for the Snorre TLP which will operate on Block 34/7 in the N...
Float-over of Arthit PP Deck
Float-over of Arthit PP Deck
Abstract In December 2007, the 17,500-metric ton, Arthit PP deck was installed over the substructure in a single piece by a using J. Ray McDermott's (J. Ray) tran...
TOTAL FLOAT MANAGEMENT TECHNIQUE UNDER THE FLOAT AND RESOURCE LOADING
TOTAL FLOAT MANAGEMENT TECHNIQUE UNDER THE FLOAT AND RESOURCE LOADING
Schedule delays in construction projects are a common occurrence and have a significant impact on the overall project duration. Plentiful delay analysis techniques have been propos...